Deep Excavation Monitoring

Location: Burnaby, British Columbia, Canada   Background Construction of the Gilmore ...

Read More »

Earthworks Slope Monitoring

Location: Warden, Northumberland, England Background Researchers identified a flood defenc...

Read More »

Settlement Monitoring Of Reclaimed Land

Background Location: Cork, Ireland The Dunkettle Interchange, just east of Cork City in Ir...

Read More »

Railway Arch Bridge Monitoring

Successful Results Location: Leeds, UK Sensor data is reliable and accurate and transmits ...

Read More »

Pipeline Monitoring

Successful Results Location: Sabah & Sarawak, Malaysia Sensor data is reliable and acc...

Read More »

Pile Load Test Monitoring

Successful Results Location: Delta, BC, Canada The consultant was able to obtain high qual...

Read More »

Retaining Wall Monitoring

Successful Results Location: River Wandle, London, England The remote real-time monitoring...

Read More »

Slope Stability Monitoring

Successful Results Location: North East of Lillooet, BC Canada Reliable and accurate data ...

Read More »

Automated Data Collection

  Background A tailings dam at an Australian mine had vibrating wire piezometers which w...

Read More »

Underground Tunnel Monitoring

Successful Results Location: Switzerland The piezometers withstood all the rigors of the s...

Read More »

Excavation Shoring Monitoring

Successful Results Location: New Westminster, BC Canada This project is ongoing, but monit...

Read More »

Bridge Abutment Monitoring

Background Location: British Columbia, Canada FortisBC Inc. (electricity and natural gas) ...

Read More »

Speak with an Expert

I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
 