File Name
Borehole Packers
Resource Type
BrochureLanguage | Version | Download |
---|---|---|
English | BPB0001R | |
Portuguese | BPB0007A | |
Spanish | BPB0004C |
NOTE: This is a legacy and discontinued product not available for order.
RST Instruments Borehole Packers are pneumatically or hydraulically inflatable packers that incorporate one fixed and one sliding head attached to a center shaft.
NOTE: This is a legacy and discontinued product not available for order.
RST Instruments Borehole Packers are pneumatically or hydraulically inflatable packers that incorporate one fixed and one sliding head attached to a center shaft. This sliding head allows the packer gland to retract about the center shaft as it inflates. The packer heads are constructed of either plated steel or aluminum while the shaft is polished stainless steel or aluminum. The packer gland consists of a rubber membrane reinforced with either polyester fabric or steel. Packers made from steel heads, stainless steel shaft and a steel-reinforced gland are suitable for medium pressure applications.
MODEL | PART # | DEFLATED DIAMETER | MAX. INFLATED DIAMETER | MAX. UNCONFINED WORKING PRESSURE* | STANDARD GLAND LENGTHS | CENTRE SHAFT I.D. | SHAFT THREAD SIZE |
N | BP0053
BP0054 |
4.3 cm / 1.69 in. | 8.25 cm / 3.25 in. | 2482 kPa / 360 psi | 635 mm (25 in.) 1000 mm (40 in.) | 1.25 cm / 0.493 in. | 3/8 NPT |
H | BP0103
BP0104 |
5.7 cm / 2.25 in. | 11.05 cm / 4.35 in. | 1930 kPa / 280 psi | 635 mm (25 in.) 1000 mm (40 in.) | 2.09 cm / 0.824 in. | 3/4 NPT |
P | BP0153
BP0154 |
7.2 cm / 2.83 in. | 14.78 cm / 5.82 in. | 1172 kPa / 170 psi | 635 mm (25 in.) 1000 mm (40 in.) | 3.51 cm / 1.38 in. | 1 1/4 NPT |
P5-9 | BP0224 | 11.9 cm / 4.7 in. | 25.65 cm / 10.1 in. | 965 kPa / 140 psi | 1250 mm (49 in.) | 5.26 cm / 2.07 in. | 2 NPT |
*The working pressures are specified in free air.
Borehole Packers are commonly used for:
View illustrations on how Borehole Packers are used for:
I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd