File Name
Terminal Station
Language | Version | Download |
---|---|---|
English | ELB0082B |
Terminal Station provides a single, organized enclosure for manual readings of installed vibrating wire sensors and their thermistors using manual readouts.
Terminal Station provides a single, organized enclosure for manual readings of installed vibrating wire sensors and their thermistors using manual readouts. Vibrating wire sensors without thermistors can also be connected to the Terminal Station.
The user selects which sensor to read using the up/down buttons to cycle through the channels until the desired channel is reached. RST’s VW2106 Vibrating Wire Readout (see separate brochure) is connected to the Terminal Station via a fly lead to take readings of the selected sensor.
Connecting sensor cables into the Terminal Station is quick and simple. Conduit fittings on the outside of the enclosure allow passage of the cable to the inside, where connections are made to the desired terminal block. Each terminal block is labeled to correspond with the channel number for user clarity.
Terminal Station enclosure is NEMA 4X and meets IP65 criteria for demanding conditions.
DESCRIPTION | SPECIFICATION |
Number of Channels | 24 channel (4 Pole) |
Switching Current | 0.5 A typical |
Initial Contact Resistance | 100 mΩ |
Insulation Resistance | >10,000 MΩ |
Switch Life | 25,000 cycles minimum |
Enclosure – Dimensions | 359 x 311 x 156 mm (14 x 12 x 6 in. ) |
Enclosure – Rating | NEMA 4X, IP65 |
Battery Life | 30 hours of continuous operation (with full charge) |
Where a single, organized enclosure is required for selecting installed vibrating wire sensors and their thermistors for quick and easy manual readings – all with a simple press of a button.
ITEM | PART # |
Terminal Station 24 Channel 4 Pole, Duo Feed-Manual Readout | ELTS4224 |
ITEM | PART # |
Vibrating Wire Readout | VW2106 |
Bare Lead Fly Lead | VW2106-BL |
I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd