PVC Wellscreen and Threaded Pipe

NOTE: This is a legacy and discontinued product not available for order.

RST Accu-Seal PVC Wellscreen and Pipe is a system of top-quality monitoring pipe products for groundwater hydrology, environmental, drainage, water wells, and geotechnical applications. The pipe can be slotted and/or threaded.

Overview

NOTE: This is a legacy and discontinued product not available for order.

RST Accu-Seal PVC Wellscreen and Pipe is a system of top-quality monitoring pipe products for groundwater hydrology, environmental, drainage, water wells, and geotechnical applications. The pipe can be slotted and/or threaded.

RST’s Flush Threaded PVC Well Casing is engineered to be assembled quickly and accurately for use in water wells and similar applications. Slotted PVC Well Screens are also available.


PVC WELLSCREEN AND THREADED PIPE SPECIFICATIONS: SCHEDULE 40

INCHES LENGTHS (NOMINAL) O.D. I.D. THREAD OPTION SLOTS (FULL LENGTH, STANDARD PATTERN)
1.0 5 ft., 10 ft. 1.315 1.049 F480 0.010 in., 0.020 in.
1.5 5 ft., 10 ft. 1.900 1.610 F480 0.010 in., 0.020 in.
2.0 5 ft., 10 ft. 2.375 2.067 F480 0.010 in., 0.020 in.
2.5 5 ft., 10 ft. 2.875 2.469 F480 0.010 in., 0.020 in.

 

PVC WELLSCREEN AND THREADED PIPE SPECIFICATIONS: SCHEDULE 80

INCHES LENGTHS (NOMINAL) O.D. I.D. THREAD OPTION SLOTS (FULL LENGTH, STANDARD PATTERN)
0.75 5 ft., 10 ft. 1.050 0.741 F480 N/A
1.0 5 ft., 10 ft. 1.315 0.957 F480 0.010 in., 0.020 in.
1.5 5 ft., 10 ft. 1.900 1.500 F480 0.010 in., 0.020 in.
2.0 5 ft., 10 ft. 2.375 1.939 F480 0.010 in., 0.020 in.
2.5 5 ft., 10 ft. 2.875 2.323 F480 0.010 in., 0.020 in.

PVC Wellscreen and Threaded Pipe are commonly used for water wells and similar applications.

File Name

PVC Pipe Wellscreen and Threaded Pipe

Resource Type

Brochure
Language Version Download
English EPB0016F

Speak with an Expert

I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
 
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd