File Name
Water Level Meter
Resource Type
BrochureLanguage | Version | Download |
---|---|---|
English | WLB0002M | |
Portuguese | WLB0015A |
RST Water Level Meters are used for convenient and accurate measurement of elevation of groundwater in boreholes, standpipes, and wells. They employ a high accuracy, NIST traceable, non-stretch, flat tape, permanently marked in 1 mm or 1/100 ft. graduations.
RST Water Level Meters are used for convenient and accurate measurement of the elevation of groundwater in boreholes, standpipes, and wells. They employ a high accuracy, NIST traceable, non-stretch, flat tape, permanently marked in 1 mm or 1/100 ft. graduations.
The RST Water Level Meter is supplied on a sturdy winding reel complete with a brake and carrying handle. Features include a shrouded stainless steel probe (allows accurate level determinations under cascading water conditions), a buzzer (with adjustable volume control), and sensitivity control as standard. The moisture-resistant electronics and standard 9V battery are housed in the front for quick and easy access.
TAPE LENGTH | PART # / POLY TAPE |
30 m | WL1030 |
50 m | WL1050 |
100 m | WL1100 |
150 m* | WL1150 |
200 m* | WL1200 |
300 m** | WL1300 |
100 ft | WL2010 |
150 ft | WL2015 |
300 ft | WL2030 |
500 ft* | WL2050 |
Contact RST for additional lengths.
* Mounted on a medium-sized reel.
** Mounted on a large-sized reel.
Water Level Meters are commonly used for measuring the elevation of groundwater in standpipes, boreholes, and wells.
View illustrations on how Water Level Meters are used for landfills.
ITEM | PART # |
Aluminum carrying/shipping cases:
– up to 100 m / 300 ft |
WL6505
WL6504 IC3031C |
Soft vinyl carrying cases:
– up to 200 m / 500 ft |
WL6506
IC6508 |
Replacement tapes with probe | Please contact RST for more information. |
I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd