File Name
PVC Pipe Wellscreen and Threaded Pipe
Resource Type
BrochureLanguage | Version | Download |
---|---|---|
English | EPB0016F |
NOTE: This is a legacy and discontinued product not available for order.
RST Accu-Seal PVC Wellscreen and Pipe is a system of top-quality monitoring pipe products for groundwater hydrology, environmental, drainage, water wells, and geotechnical applications. The pipe can be slotted and/or threaded.
NOTE: This is a legacy and discontinued product not available for order.
RST Accu-Seal PVC Wellscreen and Pipe is a system of top-quality monitoring pipe products for groundwater hydrology, environmental, drainage, water wells, and geotechnical applications. The pipe can be slotted and/or threaded.
RST’s Flush Threaded PVC Well Casing is engineered to be assembled quickly and accurately for use in water wells and similar applications. Slotted PVC Well Screens are also available.
INCHES | LENGTHS (NOMINAL) | O.D. | I.D. | THREAD OPTION | SLOTS (FULL LENGTH, STANDARD PATTERN) |
1.0 | 5 ft., 10 ft. | 1.315 | 1.049 | F480 | 0.010 in., 0.020 in. |
1.5 | 5 ft., 10 ft. | 1.900 | 1.610 | F480 | 0.010 in., 0.020 in. |
2.0 | 5 ft., 10 ft. | 2.375 | 2.067 | F480 | 0.010 in., 0.020 in. |
2.5 | 5 ft., 10 ft. | 2.875 | 2.469 | F480 | 0.010 in., 0.020 in. |
INCHES | LENGTHS (NOMINAL) | O.D. | I.D. | THREAD OPTION | SLOTS (FULL LENGTH, STANDARD PATTERN) |
0.75 | 5 ft., 10 ft. | 1.050 | 0.741 | F480 | N/A |
1.0 | 5 ft., 10 ft. | 1.315 | 0.957 | F480 | 0.010 in., 0.020 in. |
1.5 | 5 ft., 10 ft. | 1.900 | 1.500 | F480 | 0.010 in., 0.020 in. |
2.0 | 5 ft., 10 ft. | 2.375 | 1.939 | F480 | 0.010 in., 0.020 in. |
2.5 | 5 ft., 10 ft. | 2.875 | 2.323 | F480 | 0.010 in., 0.020 in. |
PVC Wellscreen and Threaded Pipe are commonly used for water wells and similar applications.
I’m very happy with the quality of the instrumentation and technical support from RST, as always. They worked with us from the initial stages of the project to ensure that we were fully prepared and equipped to use the RSTAR network for the first time. They delivered everything within the tight project time frame to ensure that there were no delays on site, and the submersible tilt meters looked like new even after over twelve months of being submerged in Thames water!
-Richard Lipscombe, BEng (Hons), Director & Principle Consultant - RL Geotechnical Ltd