Customer success story

Pile Load Test Monitoring

Location

Delta, BC, Canada

Project Partners

Owner: BC Ministry of Transportation and Infrastructure

Consultant: Golder Associates

 

Successful Results

The consultant was able to obtain high quality real-time data for the various parameters they monitored. Without the custom solutions RST provided, the data quality would not have been sufficient.

Potential safety concerns and costly disruptions related to the impact of the pile testing on the existing tunnel were minimized.

Background

The Massey Tunnel in Delta, BC was built in the 1950’s and is a congested tunnel structure. It averages 86,000 vehicle trips through it on a daily basis. A replacement bridge (Massey Bridge) was proposed to replace the tunnel and improve traffic congestion. The proposed capital cost of the project was $3.5 billion.

Scope/Objective

The replacement bridge design required a pile load test for a 2m diameter, 67m long, 60MN capacity steel pipe pile which required driving fi ve 2m diameter pipe piles (1 test pile and 4 reaction piles) adjacent to the existing, operating Massey Tunnel. During the pile load test, the following parameters were monitored: loading from the hydraulic jacks, load transfer down the pile and displacement of the pile.

Challenges

Due to the complex nature of the project, and the large capacity of the proposed bridge piles, traditional instrumentation was not suitable for the test. The driving of 5-2m pipe piles adjacent to the tunnel required crack and vibration monitoring of the existing tunnel structure. The project site is adjacent to the Fraser River where the ground consists of unconsolidated, fi ne-grained, river sediments which are prone to settlement and liquefaction under seismic conditions.

Solution

RST worked in collaboration with Golder Associates to supply an elaborate instrumentation package, which included custom products, to precisely monitor the pile load test in the challenging environment.

Benefits

The custom instrumentation allowed Golder to monitor the site parameters in real-time to allow for quick decisions to be made during the test, and for full analysis later on. Potential safety concerns and costly disruptions related to the impact of the pile testing on the existing tunnel were minimized.

RST products used in this project

 

Strain Gauge Load Cells




Vibrating Wire Strain Gauge




FlexDAQ Data Loggers


Download this success story

Don’t have time to read this now? Complete the form to download this success story in PDF format. We will also email you a copy for future reference.



All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or  other electronic or mechanical methods, without the prior written permission of RST Instruments Ltd. RST reserves the right to change specifi cations without notice. ©2018 RST Instruments Ltd. MIR0046A.