Customer success story

Automated Data Collection – RSTAR

Location

Queensland, Australia

Project Partners

HMA Geotechnical

Successful Results

Successful implementation of the RSTAR System; it performs readings as scheduled without interruption.
The logistics and costs associated with performing manual readings at the tailings dam have been decreased through automation.
Coverage over the expansive monitoring area was addressed by the use of Yagi antennas installed at node level. Signals are transmitted to the Hub, which is nearly 2km away from the farthest node. Potential disruptions to the mining operations are now minimized.

Background

A tailings dam at an Australian mine had vibrating wire piezometers which were measuring the pore water pressure of  the dam. Readings from the piezometers were being taken manually; however, the regularity of the readings was interrupted by harsh weather, site hazards, staffing and related factors.

Scope/Objective

The mine managers needed to eliminate the roadblocks inherent with taking manual readings and achieve more continuous data that was reliable and accurate.

Challenges

The monitoring area was wide and expansive with on-site civil construction being performed. Exposure to corrosive elements and extreme weather also had to be considered. The solution addressed all these issues and ultimately worked harmoniously with the customer’s existing SCADA & instrumentation – all while providing automated real-time site monitoring capabilities from a remote location.

Solution

RST and its Australian partner, HMA Geotechnical, provided RST’s ‘RSTAR’ Radio Array System as a ‘turn-key’ data collection solution. It addressed all the site’s challenges and met the user’s requirements, enabling them to improve their decision-making and increase productivity without sacrificing safety.

Benefits

The nodes’ data loggers were powered by a single lithium ‘D’ cell which provides years of power. Automated, reliable and accurate sensor data was sent in real-time to the user’s desktop PC – allowing for quick decision-making and data analysis from a remote site. Direct support/service was provided by HMA, in addition to RST’s technical expertise and support/service.

Results

Successful implementation of the RSTAR System; it performs readings as scheduled without interruption. The logistics and costs associated with performing manual readings at the tailings dam have been decreased through automation. Coverage over the expansive monitoring area was addressed by the use of Yagi antennas installed at node level. Signals are transmitted to the Hub, which is nearly 2km away from the farthest node. Potential disruptions to the mining operations are now minimized.

RST products used in this project

 

RSTAR Radio Array System




DT Series Data Loggers




FlexDAQ Data Logger


Download this success story

Don’t have time to read this now? Complete the form to download this success story in PDF format. We will also email you a copy for future reference.



All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods without the prior written permission of RST Instruments Ltd. RST reserves the right to change specifications without notice. ©2019 RST Instruments Ltd. MIR0050A.

VIEW OTHER SUCCESS STORIES